    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:5752次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 无码视频一区二区三区在线观看| 中国老熟妇自拍hd发布| 航空| 国产免费不卡午夜福利在线 | 人妻精品一区二区| 米奇精品一区二区三区| 野狼av午夜福利在线| 中文无码久久精品| 自偷自拍亚洲综合精品| 久久精品国产99国产精品澳门 | 久99视频精品免费观看福利| 亚洲一区二区偷拍| 四季亚洲AV永久无码精品尤物app| 日韩精品亚洲专区在线观看| 国产免费AV网站| 亚洲AV成人无码久久精品| 国产亚洲欧洲中文天堂| 欧美怡春院| 伊人久久精品无码麻豆一区| 91综合网| xxxx.中出日韩| 自慰高潮喷白浆在线观看| 天天爽夜夜爱| 午夜色无码大片在线观看免费 | 国产伦精品一区二区三区免.费| 人人妻人人澡人人爽欧美精品潮喷| 国产 另类 在线 欧美日韩| 国产精品V日韩精品| 情侣av在线| 四虎永久在线精品无码| 99久久亚洲综合精品成人网| 熟妇人妻中文字幕| 美女福利一区二区三区在线观看| 久久精品国产中文字幕| 亚洲国产一区二区三区最新| 国产成人久久久精品二区三区 | 国产成人8X人网站视频| 熟女丝袜逼| 国产精品无码dvd在线观看| 国产69久久精品一区二区| 亚洲乱亚洲乱少妇无码|